Overview
These projects where tabled in SY2023 due to lack of manpower. Two (Report Card, Website) were sustained and have their own separate page.
The projects do need to be pursued. Therefore, this documentation is maintained for when that could be done.
During SY2022, MSS administrators, staff, and faculty had been working to identify the critical issues requiring the most immediate attention. By the end of the school year, MSS personnel had identified four immediate priorities, and spent the summer of 2022 working on projects to address them.
| Priorities | Projects to Address Priorities Projects Period: 6/27 - 7/29 |
Status 7/29/22 | Status 5/30/23 |
|---|---|---|---|
| 1. Policy Consistency | 1. Review of the Handbook Laureen, Gloria, Sharon 2. Base Documents for Teachers Susan, Sabeth (Volunteer) |
||
| 2. Concrete and Adequately Resourced Curriculum | 3. Instructional Materials Rose, Maricel, Rica 5. MSS Official Teacher Technology Adhem, Maricon |
||
| 3. Teacher Enhancment Policy | No project. Instead, initiated trainings All | ||
| 4. Admin and Technical Support | 4. Tech Set Up for Grade 4 Ray 6. Student and Staff Lists Dilbung, Gina 7. Electronic Grading System Camilla, Dawn, Tokie |
After that summer, teachers and staff returned to their regular duties. Even though the projects were only about 30% complete, there was not enough manpower to continue.
Two projects arose from this effort: MSS Website, and the MSS Report Card System. The rest are temporarily tabled until MSS can review and decide on any future action.